Free activity, PAS or single authorisation: how to read the Italian Renewables Consolidated Act
Legislative Decree 190/2024 reorganised permits into three regimes. How to tell which applies to a plant and what to check before filing…
Catania, Italy · Working across Italy
Services
Studies and designs for plants and associated works, from feasibility to detailed design.
Overview
Land, grid, constraints, output and costs all depend on one another: when one changes, the rest must be reviewed.
That is why we keep layout, capacity and connection point aligned across the design, the connection quote and the application, and revisit the project when regulations or conditions change.

What we design
First checks on area, constraints, connection and output, to understand whether it's worth going ahead.
Plant arrangement, capacity and technical choices based on the site and the client's goals.
Connection solution, cable route and associated works, consistent with the project schedule.
Drawings and reports for permitting, aligned with the environmental and landscape studies.
The level of detail needed to tender and build.
Review of ongoing projects, including conversion from solar PV to agrivoltaics.
The phases
01
It checks whether the area and the connection hold up, before spending on design.
02
The project is defined with the studies needed for permitting and stays consistent with the application.
03
It reaches the detail needed to choose contractors and open the site.
Technologies

Ground-mounted plants, from design to operation.

Energy and crops on the same land.

Harnessing the region's wind.

Energy storage batteries.

The infrastructure of data.
Further reading
Legislative Decree 190/2024 reorganised permits into three regimes. How to tell which applies to a plant and what to check before filing…
Many projects start as solar PV and become agrivoltaic. The conversion affects layout, structures, farm plan and permitting: the requirements to keep in mind.
The Constitutional Court rejected doubts over the limit on ground-mounted modules in agricultural zones. What remains possible and in what order to check…
Tell us where you stand: we'll tell you at which phase we can help.